Skip to main content
Gatherland

Group supply pickup and delivery window

Gatherland

List each collection or delivery as a separate handover. Confirm the receiving person, the agreed time window and the actual destination before placing the order. Keep a buffer appropriate to the organiser’s plan rather than assuming a universal delivery duration. An event start time is not automatically the time when the venue accepts deliveries.

How to use it

  1. Use the supplier’s confirmed window and the venue’s confirmed receiving arrangements.
  2. Assign a receiver for each handover and tell them what they should check.
  3. Record actual receipt and follow up missing items through the order owner.

Worksheet preview

Group supply pickup and delivery window
HandoverConfirmed windowActual destinationReceiverItems to checkReceipt and follow-up
First collection
Second collection
Supplier delivery
Participant brings supplies
Venue-provided items
Return collection

Open the CSV in Excel, Numbers or Google Sheets. Save a copy before editing.

Keep order ownership visible

The person collecting a parcel may not have placed the order. Give them the item list and a way to reach the order owner without posting payment or private contact details publicly. For several deliveries, mark each one separately rather than using one “arrived” checkbox for the whole event.

Use the real receiving location

A venue address can be different from a permitted loading or collection point. Confirm the destination and access instructions with the relevant parties. If the window changes, update the receiver and the supplier together so neither relies on an obsolete message.

Continue planning

Group supply pickup and delivery window|Gatherland